People sitting and talking in a green outside area

About Hestia

Since its inception in 1970, Hestia has been dedicated to assisting adults in crisis, successfully providing safe spaces for over 800 people to now sleep at night.

The Background

During the early stages of its digital transformation, Hestia faced significant challenges in managing internet connectivity across its 130 sites.

The Solution

Following a successful tender, Wanstor executed a transformation of Hestia’s infrastructure, delivering unique and substantial benefits resulting in cost savings of £225k.

Wanstor took great care to ensure minimal disruption to daily operations and made sure not to interfere with the workflow of staff on the ground."
Head of IT,
Hestia
Bearded man sitting at table speaking to someone faced away from the camera

Outcomes

  • Clear cost reductions equalling £225k over five years
  • Robust, secure and faster internet at each site
  • A fully-managed service with proactive engineering
  • Future-proofed infrastructure ready for digitalisation
Download full Case Study