Aerial view of HOST Hinkley Power Station Campus

About HOST

HOST has the huge undertaking of providing accommodation for all 1,496 contractors who work at the Hinkley Point nuclear power station – a £26 billion government project and an EDF-run project. The business’ mission is to provide a modern, comfortable environment for contractors to live and relax in after work, making campuses a home from home whilst the site is being built.

The Challenge

When the first campus opened its doors, HOST’s incumbent provider had four fulltime engineers permanently onsite. It was a costly and rigid format which offered few options to adapt and innovate as the site evolved and new technologies became available. HOST needed a full, end-to-end solution covering every aspect of its IT needs.

The Solution

After a seamless integration, we now deliver remote management and monitoring of all of HOST’s IT on both campuses as part of a five-year support contract which includes all IT infrastructure, networking, connectivity and management as well as enterprise-grade security and resiliency.

Wanstor have been a breath of fresh air. They are so proactive in making recommendations, both to improve our setup and to make cost savings."
Colin Weeks,
Financial Controller, HOST
HOST lounge with staff member enjoying a drink while relaxing on a sofa

Outcomes

  • Remote management and monitoring of HOST’s entire infrastructure and networking
  • A more agile and flexible way of working
  • Enterprise grade security
  • Management of Microsoft licensing
  • Costs reduced by 32%